First Patriot deploys JMG Solar System to cut energy costs by N55m annually

 

 

First Patriot Limited, a mining and mineral processing company specialising in lead and zinc, has installed a hybrid solar power system supplied by JMG Solar, with projected annual savings of between N50 million and N55 million.

The installation is expected to significantly reduce the company’s dependence on diesel-powered electricity, lower operating expenses and improve energy efficiency across its mining and processing operations.

Before the intervention, First Patriot relied on a 400 kVA diesel generator to power its facility, incurring estimated operating and maintenance costs of about N8 million monthly.

To address the rising cost of energy, the company engaged JMG Solar, the solar power division of JMG Limited, to develop an alternative that would reduce diesel consumption without compromising its electricity requirements.

The resulting hybrid installation comprises a 250kW solar inverter, 200kWh lithium-ion battery storage and 280kWp monocrystalline solar panels.

The system operates alongside the company’s existing power sources, maximising solar energy use during daylight hours while battery storage and intelligent power management help meet electricity demand and coordinate generator support when necessary.

READ ALSO; Darkness returns to Longbridge as vandals remove 168 Solar streetlights on Lagos-Ibadan Expressway

Beyond the projected financial savings, the installation is expected to reduce generator operating hours, lower equipment maintenance requirements, improve power stability and minimise the facility’s carbon emissions.

Speaking on the project, Rabi Jammal, Chief Commercial Officer of JMG Limited, said the installation demonstrated how businesses could adopt strategic energy solutions to manage rising operating costs without disrupting productivity.

He said energy expenses had become a major concern for companies requiring consistent electricity to sustain their operations, adding that JMG’s focus was to provide practical solutions that improve efficiency and give businesses greater control over energy consumption.

According to him, the hybrid system would enable First Patriot to maximise solar power, reduce its reliance on diesel generators and achieve more predictable energy costs.

The project was delivered through JMG’s turnkey model, which covered engineering design, equipment supply, installation and commissioning. The approach ensured that the new solar infrastructure was integrated with the mining company’s existing power arrangements.

The development reflects the growing adoption of hybrid solar solutions by Nigerian businesses seeking to reduce exposure to rising diesel costs and unreliable grid electricity.

For energy-intensive industries such as mining and mineral processing, where uninterrupted power is essential to production, the shift towards solar generation and battery storage is increasingly becoming a strategy for controlling operating costs, improving reliability and supporting more sustainable industrial operations.